SCAMPI V1.3 에서는 Method (심사방법론) Tailoring 에 대하여 심사 계획에서 명시하게 되어 있다.
방법론상 허용되는 또는 고려할 수 있는 Tailoring Option 에 대해 심사시 어떻게 적용되는지에 대해 구체적으로 명시하는 목적이며, 이전 심사와 틀려진 점은 V1.3 에서 추가된 1.3.2 내용 이외에는사실상 없다고 해야할 것이다.
아래 table 이 심사계획(Appraisal Plan) 안에 명시되어야 한다
MDD Process |
Tailoring Decision |
Tailoring Options |
Option Chosen (Y/N) |
Tailoring Rationale (Which option was chosen, and why.) |
1.1.1 Determine Appraisal Objectives |
Appraisal usage mode |
Internal Process Improvement, Supplier Selection, or Process Monitoring |
||
1.1.2 Determine Data Collection Strategy |
Collection of objective evidence during the planning or conduct phase or combinations of both approaches |
Discovery, managed discovery, verification |
||
1.1.4 Determine Appraisal Scope |
Use of incremental appraisals |
|||
1.1.5 Determine Appraisal Outputs |
Selection of optional ratings and findings |
Optional findings: non-model findings, final report, recommendations, process improvement action plan, basic unit specific findings |
|
|
Optional ratings: process area, maturity level, |
|
| ||
1.3.2 Prepare Team |
Deliver Appraisal Method training to more than a single team at the same event |
Reference waiver |
|
|
1.3.2 Select Team Members |
Accept one team member with no field experience |
|
|
|
1.3.4 Prepare Team |
Teams involved in U.S. government source selection or process monitoring |
Specify additional training to be provided |
|
|
1.4.2 Inventory Objective Evidence |
Collection of objective evidence during the planning or conduct phase or combinations of both approaches |
Discovery, managed discovery, verification |
|
|
1.5.1 Perform Readiness Review |
Practice characterizations are done before or during the readiness review |
Conduct Appraisal phase begins |
|
|
1.5.1 Perform Readiness Review |
Class B or C (SCAMPI B or C) used as readiness review |
Conduct Appraisal phase begins |
|
|
1.5.1 Perform Readiness Review |
Used as one of the iterative data collection activities in a Managed Discovery approach. |
|
|
|
2.2.1 Examine Objective Evidence from Artifacts |
Evaluate the content of artifacts to determine how it supports model practice implementation during readiness review or other appraisal preparation activity |
Conduct Appraisal phase begins |
|
|
2.2.2 Examine Objective Evidence from Affirmations |
Evaluate the information from affirmations to determine how it supports model practice implementation during readiness review or other appraisal preparation activity |
Conduct Appraisal phase begins |
|
|
2.2.2 Examine Objective Evidence from Affirmations |
Use of virtual methods for affirmations |
Appraisal plans should address possible risks with the use of virtual methods. |
|
|
2.6.2 Determine Process Area Ratings |
This is an optional activity selected at the discretion of the appraisal sponsor |
|
|
|
2.6.3 Determine Process Area Profile |
This is an optional activity selected at the discretion of the appraisal sponsor |
|
|
|
2.6.4 Determine Maturity Level |
This is an optional activity selected at the discretion of the appraisal sponsor |
|
|
|
3.1.2 Conduct Executive Session(s) |
This is an optional activity selected at the discretion of the appraisal sponsor |
|
|
|
3.1.3 Plan for Next Steps |
This is an optional activity selected at the discretion of the appraisal sponsor |
|
|
|
3.2.1 Collect Lessons Learned |
This is an optional activity selected at the discretion of the appraisal sponsor |
|
|
|
--------------------------------------------------------------------------------------
Kim, Sungil (金成一)
SEI 공인 CMMI 인증 선임심사원, SP 품질인증 선임심사원
Live Pro-Consulting (www.LivePro.kr) 대표/대표컨설턴트
Tel) 070-4124-7522 Mobile) 010-3137-7522 Fax) 02-6280-7520
Address) 135-565 서울 강남구 역삼1동 702-10 아남 타워 빌딩 917호
Twitter: http://twitter.com/sungil Facebook: www.facebook.com/go2hevn
Blogs: http://blog.naver.com/go2hevn , http://sungilkim.tistory.com
--------------------------------------------------------------------------------------
'CMMI > V1.3 Upgrade 정보' 카테고리의 다른 글
SCAMPI(CMMI표준심사방법론) V1.3에서의 심사대상 조직 및 sample 프로젝트 정의 (0) | 2011.06.09 |
---|---|
SCAMPI(CMMI표준심사방법론) V1.3에서의 심사데이터 요건 (0) | 2011.06.09 |
SCAMPI(CMMI표준심사방법론) V1.3에서의 심사팀 구성 조건 (0) | 2011.06.09 |
심사팀멤버의 CMMI V1.3 Upgrade 교육 이수 요건 (0) | 2010.11.07 |
CMMI V1.3 이 공식적으로 Release 되었습니다 (11/01->10/28) (0) | 2010.11.07 |